A dataset of capital projects data scraped from the "Capital Project Detail Data" pdfs published by the New York City Office of Management and Budget.

4 commits5,200 rows1.6MBcsv
HEAD Xxky6mu  body changed by 15%
4 months ago
Readme

NYC Capital Project Detail Data

A dataset of capital projects data scraped from the “Capital Project Detail Data” pdfs published by the New York City Office of Management and Budget.

Background

The Capital Project Detail Data pdfs are a more human-friendly publication of the Capital Commitment Plan, a series of documents that outlines the city’s capital spending over the next several years.

You can see the November 2020 Capital Commitment Plan and Capital Project Detail Data pdfs here: https://www1.nyc.gov/site/omb/publications/fy21-accp.page

The Data

Each row represents a capital project, and corresponds to a single page in the scraped PDF. For example, here is the page for project id LB20DUMBO, ADAMS STREET LIBRARY FITOUT

CAPITAL_CONSTRUCTION_PROJECT_DETAIL_DATA_-_Brooklyn

The corresponding row in this dataset looks like this:

{
   "project_id":"LB20DUMBO",
   "project_description":"ADAMS STREET LIBRARY FIT OUT",
   "managing_agency_id":"038",
   "managing_agency":"BROOKLYN PUBLIC LIBRARY",
   "ten_year_plan_category":"ESSENTIAL RECONSTRUCTION OF FACILITIES",
   "community_boards_served":"201",
   "borough":"BROOKLYN",
   "budget_lines":"LB-0101 LB-0108 LB-0104",
   "original_budget":5000,
   "city_prior_actuals":0,
   "city2021":5000,
   "city2022":0,
   "city2023":0,
   "city2024":0,
   "city2025":0,
   "city_r_t_c":0,
   "city_total":5000,
   "non_city_prior_actuals":0,
   "non_city2021":5000,
   "non_city2022":0,
   "non_city2023":0,
   "non_city2024":0,
   "non_city2025":0,
   "non_city_r_t_c":0,
   "non_city_total":5000,
   "combined_prior_actuals":0,
   "combined2021":10000,
   "combined2022":0,
   "combined2023":0,
   "combined2024":0,
   "combined2025":0,
   "combined_r_t_c":0,
   "combined_total":10000,
   "explanation_for_delay":"PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGN",
   "project_location":"",
   "scope_summary":"NEW BRANCH FIT OUT",
   "source_pdf":"cpd11-20bk.pdf"
}

Milestones

Milestones have a many-to-one relationship with projects, and have been stored in a separate dataset: nyc_capital_project_detail_data_milestones.

What can I do with this dataset?

This dataset includes community_boards_served, which contains the most granular geographic data available at the moment. While not all projects serve specific community boards (some are citywide), and some serve more than one, it is possible to aggregate the total value of commitments for a given community board using this data.

You can also do some analysis of original_budget vs combined_total for each project to see which projects are costing more than originally planned.

Milestones also have original and current start and end dates, making it possible to analyze project delays.

Future Work - More precise geometries

Many of the projects listed here can be assigned a more precise geometry (either a point or a polygon). This would be a heavy lift of geocoding, but would provide for more granular analyses of capital spending within arbitrary study areas. I spent few years working on this exact project at the NYC Department of City Planning, but the data were never shared. With this new dataset, we have the opportunity to crowd-source the creation of geometries for the 4000-or-so non-citywide projects. Contact me if you’re interested in helping out.

CSV
1.53 MB
5,200
2

CSV Configuration

This table contains a header row
This table uses different quotes to indicate strings

Schema

titletypedescription
project_id
string
the unique identifier for this capital project
project_description
string
a description of the capital project
managing_agency_id
integer
the id of the agency that manages this capital project
managing_agency
string
the name of the agency that manages this capital project
ten_year_plan_category
string
the category assigned to this project in the ten-year capital strategy
community_boards_served
string
space-delimited list of community district codes that this project serves. (101 = Manhattan Community District 1)
borough
string
the borough that this capital project serves. One of NYC's five boroughs or 'Citywide'
budget_lines
string
the capital budget lines that fund this capital project
original_budget
integer
the original budgeted amount for this capital project
city_prior_actuals
integer
prior actual city-funded spending on this capital project
city2021
integer
planned city-funded spending on this capital project for a specific fiscal year
city2022
integer
planned city-funded spending on this capital project for a specific fiscal year
city2023
integer
planned city-funded spending on this capital project for a specific fiscal year
city2024
integer
planned city-funded spending on this capital project for a specific fiscal year
city2025
integer
planned city-funded spending on this capital project for a specific fiscal year
city_r_t_c
integer
?
city_total
integer
total planned city-funded spending on this capital project
non_city_prior_actuals
integer
prior actual non-city-funded spending on this capital project
non_city2021
integer
planned non-city-funded spending on this capital project for a specific fiscal year
non_city2022
integer
planned non-city-funded spending on this capital project for a specific fiscal year
non_city2023
integer
planned non-city-funded spending on this capital project for a specific fiscal year
non_city2024
integer
planned non-city-funded spending on this capital project for a specific fiscal year
non_city2025
integer
planned non-city-funded spending on this capital project for a specific fiscal year
non_city_r_t_c
integer
?
non_city_total
integer
total planned non-city-funded spending on this capital project
combined_prior_actuals
integer
prior actual spending on this capital project
combined2021
integer
planned spending on this capital project for a specific fiscal year
combined2022
integer
planned spending on this capital project for a specific fiscal year
combined2023
integer
planned spending on this capital project for a specific fiscal year
combined2024
integer
planned spending on this capital project for a specific fiscal year
combined2025
integer
planned spending on this capital project for a specific fiscal year
combined_r_t_c
integer
?
combined_total
integer
total planned spending on this capital project
explanation_for_delay
string
an explanation for the delays observed in a capital project
project_location
string
additional location details for this captial project
scope_summary
string
additional scope information for this capital project
source_pdf
string
the original pdf filename that this row of data was scraped from
Body Preview
qri-row-numberproject_idproject_descriptionmanaging_agency_idmanaging_agencyten_year_plan_categorycommunity_boards_servedboroughbudget_linesoriginal_budgetcity_prior_actualscity2021city2022city2023city2024city2025city_r_t_ccity_totalnon_city_prior_actualsnon_city2021non_city2022non_city2023non_city2024non_city2025non_city_r_t_cnon_city_totalcombined_prior_actualscombined2021combined2022combined2023combined2024combined2025combined_r_t_ccombined_totalexplanation_for_delayproject_locationscope_summarysource_pdf
1LB20DUMBOADAMS STREET LIBRARY FIT OUT38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES301BROOKLYNLB-0101 LB-0108 LB-01045000050000000050000000000005000000005000PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNNEW BRANCH FIT OUTcpd11-20bk.pdf
2LBC17DRBRDYKER INTERIOR RENOVATION38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES310BROOKLYNLB-D104 LB-K0011000000100807750016570000000000010080775001657DYKER INTERIOR RENOVATIONcpd11-20bk.pdf
3LBC18CTRFCORTELYOU ROOF38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES314BROOKLYNLB-D104850000012660012660000000000001266001266PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNCORTELYOU ROOFcpd11-20bk.pdf
4LBC18FHSGFT HAMILTON ROOF38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES310BROOKLYNLB-D1041750018138000156000000000018138000156PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNFT HAMILTON ROOFcpd11-20bk.pdf
5LBC18GSMRGRAVESEND MEETING ROOM38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES315BROOKLYNLB-D1043000030242000272000000000030242000272PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNGRAVESEND MEETING ROOMcpd11-20bk.pdf
6LBC18KBFSKINGS BAY FIRE SAFETY38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES315BROOKLYNLB-D1042500002520200227000000000002520200227PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNKINGSBAY FIRE SAFETYcpd11-20bk.pdf
7LBC18KBHCKINGS BAY BOILER38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES315BROOKLYNLB-D1047500007560600681000000000007560600681PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNKINGSBAY BOILERcpd11-20bk.pdf
8LBC19CHELClinton Hill Wiring Upgrade38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES302BROOKLYNLB-D10415000001500015000000000000015000150PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNCLINTON HILL WIRING UPGRADE.cpd11-20bk.pdf
9LBC20CTOPCORTELYOU OUTDOOR PLAZA38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES314BROOKLYNLB-D10435000003500035000000000000035000350PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNCORTELYOU OUTDOOR PLAZAcpd11-20bk.pdf
10LBC20MPMRMCKINLEY PARK MEETING ROOM38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES310BROOKLYNLB-D10425000025000025000000000000250000250PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNMCKINLEY PARK MEETING ROOMcpd11-20bk.pdf
11LBC20SAADSTONE AVENUE ADA ACCESSIBILITY38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES316BROOKLYNLB-D10440000004000040000000000000040000400STONE AVENUE ADA ACCESSIBILITYcpd11-20bk.pdf
12LBC20SCBMSPRING CREEK BMS38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES305BROOKLYNLB-D10415000001500015000000000000015000150SPRING CREEK BMScpd11-20bk.pdf
13LBC21MNRFMACOM ROOF REPLACEMENT38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES303BROOKLYNLB-D10400001501191001341000000000001501191001341LIBRARY ROOF RENOVATION.cpd11-20bk.pdf
14LBCENPH2CENTRAL RENOVATION - PHASE 238BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES301BROOKLYNLB-0104263450000026345026345000000000000026345026345PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNCENTRAL RENOVATION - PHASE 2cpd11-20bk.pdf
15LBEM05SWRSYSTEM-WIDE FUNDING38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES301BROOKLYNLB-0104 LB-D1044312100062650432633061389700000000000626504326330613897RENOVATIONS /REHABILITTION/ACQUISTION/INITAL OUTFITTING - SYSTEM WIDECAPITAL INITIATIVEScpd11-20bk.pdf
16LBK16HLRFHighlawn - Roof Replacement38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES311BROOKLYNLB-K001 LB-D104 LB-01019880086818000904000000000086818000904PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNHIGHLAWN - ROOF REPLACEMENTcpd11-20bk.pdf
17LBK16SCRFSPRING CREEK ROOF REPLACEMENT38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES305BROOKLYNLB-D104 LB-K00185000003858530077000000000000038585300770SPRING CREEK ROOF REPLACEMENTcpd11-20bk.pdf
18LBM18NLOHNEW LOTS BRANCH OVERHAUL38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES305BROOKLYNLB-0104 LB-D104284050002840500028405000000000002840500028405NEW LOTS OVERHAULcpd11-20bk.pdf
19LBM19BPLBBrower Park Library Fit Out38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES308BROOKLYNLB-0107 LB-D107 LB-K1073300052000000052000000000005200000005200BROWER PARK LIBRARY FIT OUTcpd11-20bk.pdf
20LBM19CAOHCANARSIE BRANCH OVERHAUL38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES318BROOKLYNLB-0104200000005000015000020000000000000005000015000020000CANARSIE BRANCH OVERHAULcpd11-20bk.pdf
21LBP18BHBRBROOKLYN HEIGHTS BRANCH FIT OUT38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES302BROOKLYNLB-0101 LB-0108 LB-0104110000163500000016350000000000163500000016350BROOKLYN HEIGHTS BRANCH FIT OUTcpd11-20bk.pdf
22LBP18LDINLEONARD INFRASTRUCTURE UPGRADE38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES301BROOKLYNLB-01013000000003000030000000000000000300003000PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNLEONARD INFRASTRUCTURE UPGRADEcpd11-20bk.pdf
23LBP18PCADPACIFIC ADA COMPLIANCE38BROOKLYN PUBLIC LIBRARYESSENTIAL RECONSTRUCTION OF FACILITIES306BROOKLYNLB-0101 LB-D1043500000037250037250000000000003725003725PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNPACIFIC ADA COMPLIANCEcpd11-20bk.pdf
24BY001-021Quad Rehab Project42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D30050005000000050000000000050000000500QUAD REHAB PROJECTcpd11-20bk.pdf
25BY003-021Ingersoll Lecture Hall Upgrades42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D30020000821117900002000000000000821117900002000BROOKLYN COLLEGEcpd11-20bk.pdf
26BY024-012Haitian Studies Institute Initial Outfitting42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D30010000001000010000000000000010000100PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNTECHNOLOGY AND CAPITAL IMPROVEMENTcpd11-20bk.pdf
27BY025-012Haitian Studies Institute Initial Outfitting42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D30010000001000010000000000000010000100PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNTECHNOLOGY AND CAPITAL IMPROVEMENTcpd11-20bk.pdf
28BY026-013Renovation of Ingersoll Extension42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION314BROOKLYNHN-D30010005797000459006256000000005797000459006256PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNRENOVATION OF INGERSOLL EXTENSIONcpd11-20bk.pdf
29BY031-017Electrical Upgrades42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-K30050000005000050000000000000050000500PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNELECTRICAL UPGRADEScpd11-20bk.pdf
30BY032-018ADA Upgrades for the Brooklyn College Student Center42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D3002500000025000025000000000000002500002500PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNADA UPGRADES FOR THE BROOKLYN COLLEGE STUDENT CENTERcpd11-20bk.pdf
31BY033-019Ingersoll Lecture Halls42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D3002000002000000020000000000000200000002000PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNINGERSALL LECTURE HALLScpd11-20bk.pdf
32BY034-019Restoration of Main Quad42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D30072400007240072400000000000072400724PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTSRESTORATION OF MAIN QUADcpd11-20bk.pdf
33BY036-020Main Quad Restoration42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-K300 HN-D3002500000025000025000000000000002500002500PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNMAIN QUAD RESTORATIONcpd11-20bk.pdf
34BY037-020Ingersoll Lecture Halls Upgrade42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D3002000002000000020000000000000200000002000INGERSOLL LECTURE HALLS UPGRADEcpd11-20bk.pdf
35CA034KG13Gas Booster Pump Upgrade42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D00512728009900012700000000280099000127GAS BOOSTER PUMP UPGRADEcpd11-20bk.pdf
36CA234KG13Library Roof Replacement42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-0206550675131323790000141860000000067513132379000014186LIBRARY ROOF REPLACEMENTcpd11-20bk.pdf
37KG001-021LIbrary Building42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D0042000020000000020000000000002000000002000KINGSBOROUGH COMMUNITY COLLEGEcpd11-20bk.pdf
38KG028-011Performing Arts Center Renovations42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-0206 HN-D002 HN-K25030006440010003000246307107000000006440010003000246307107PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTSPERFORMING ARTS CENTER RENOVATIONScpd11-20bk.pdf
39KG030-012Critical Maintenance A/P/U Buildings42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D002 HN-D0043000381101100000049110000000038110110000004911PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNCRITICAL MAINTENANCE A/P/U BUILDINGScpd11-20bk.pdf
40KG031-013Renovation of Pool Facilities42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-0206 HN-K250 HN-D002100040505000159500250000000000405050001595002500PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNRENOVATION OF POOL FACILITIEScpd11-20bk.pdf
41KG033-017Roof Replacements42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D0021000001000000010000000000000100000001000PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTSROOF REPLACEMENTScpd11-20bk.pdf
42KG043-018Campus Roadway Improvements42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D00475000007500075000000000000075000750PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNCAMPUS ROADWAYS UPGRADEScpd11-20bk.pdf
43KG044-020Marina Rehabilitation42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D0022000000200000020000000000000020000002000MARINA REHABILITATIONcpd11-20bk.pdf
44KG045-020Performing Arts Center Upgrades42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D0022000000020000020000000000000002000002000PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNPERFORMING ARTS CENTER UPGRADEScpd11-20bk.pdf
45KG201-006Additional Roof Replacement42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-020615002132020300002335000000002132020300002335PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNCONTINUATION OF ROOF REPLACEMENT AT VARIOUS BUILDINGS.cpd11-20bk.pdf
46KG203-006Gymnasium42CITY UNIVERSITYATHLETIC FIELDS, GYMNASIUMS AND EQUIPMENT300BROOKLYNHN-02063030225030200005270000000022503020000527PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTSTHIS PROJECT WILL BRING CHILLED WATER EXTENSION PIPING FROM EXISTING UNDERGROUNDcpd11-20bk.pdf
47ME001-021Athletic Center42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D3003000030000000030000000000003000000003000MEDGAR EVERScpd11-20bk.pdf
48ME018-005LIBRARY EXPANSION42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-0206523096510075000972600000000965100750009726PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNNEWcpd11-20bk.pdf
49ME027-011Carroll Street Building Upgrade42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-020610005000002190005219000000005000002190005219PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNADDITIONAL FUNDING FOR UPGRADE OF BUILDINGcpd11-20bk.pdf
50ME031-013Virtual Desktop Infrastructure42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D300140013530470000140000000000135304700001400PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNVIRTUAL DESKTOP INFRASTRUCTURE #3cpd11-20bk.pdf
51ME037-016College Prep School Classroom Improvements42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D300650006500065000000000006500065PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNCOLLEGE PREP SCHOOL CLASSROOM IMPROVEMENTScpd11-20bk.pdf
52ME038-016Child Development Center Upgrades42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D3001500000015000015000000000000001500001500PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNCHILD DEVELOPMENT CENTER UPGRADEScpd11-20bk.pdf
53ME039-017Student Lounge Upgrades42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D3001500001500000015000000000000150000001500PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNSTUDENT LOUNGE UPGRADEScpd11-20bk.pdf
54ME040-018Differently-Abled Lab42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTIONBROOKLYNHN-K300 HN-D3001000001550000015500000000000155000001550PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNDIFERENTLY-ABLED LABcpd11-20bk.pdf
55ME041-018Art and Historic Space Renovation42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D3001500000150000015000000000000015000001500PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNART AND HISTORIC SPACE RENOVATIONcpd11-20bk.pdf
56ME042-019Founder's Auditorium Renovation & Upgrades42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D3002250000225000022500000000000022500002250PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNFOUNDER'S AUDITORIUM RENOVATION & UPGRADEScpd11-20bk.pdf
57ME043-020Open Computer and Lab Digital Interactive Learning Spaces42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-K3001000001000000010000000000000100000001000OPEN COMPUTER AND LAB DIGITAL INTERACTIVE LEARNING SPACEScpd11-20bk.pdf
58ME044-020Athletic Center42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D300 HN-K3002000050000000050000000000005000000005000PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNATHLETIC CENTERcpd11-20bk.pdf
59NY008-010Student Lounge/Eating/Study Space Build-out42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION302BROOKLYNHN-K30073400000734073400000000000007340734PROJECT DELAYED PENDING RESOLUTION OF LEGAL ISSUESSTUDENT LOUNGE/EATING/STUDY SPACE BUILD-OUTcpd11-20bk.pdf
60NY010-011Library And Student Facilities Upgrade42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION302BROOKLYNHN-K30075007500000075000000000075000000750PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNLIBRARY AND STUDENT FACILITIES UPGRADEcpd11-20bk.pdf
61NY012-011Initial Outfitting of the Biological Science Labs42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D3002171090009100200000000001090009100200PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNINITIAL OUTFITTING OF THE BIOLOGICAL SCIENCE LABScpd11-20bk.pdf
62NY013-012Network Upgrades42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D3001500147202472800017470000000014720247280001747PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNNETWORK UPGRADEScpd11-20bk.pdf
63NY014-013Upgrade of Hospitality and Culinary Arts Facilities42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION302BROOKLYNHN-K30075000750000075000000000007500000750PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNUPGRADE OF HOSPITALITY AND CULINARY ARTS FACILITIEScpd11-20bk.pdf
64NY018-014Dental Hygiene Facilities Upgrade42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D30040000400000040000000000004000000400PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNDENTAL HYGIENE FACILITIES UPGRADEcpd11-20bk.pdf
65NY019-015Fabrication Laboratory42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-K30040000000400040000000000000004000400PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNFABRICATION LABORATORYcpd11-20bk.pdf
66NY020-015Academic Learning Center Renovations42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D30040000004000040000000000000040000400PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNACADEMIC LEARNING CENTER RENOVATIONScpd11-20bk.pdf
67NY021-016Academic Learning Center Renovations and Equipment42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D3001290000012900012900000000000001290001290PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNACADEMIC LEARNING CENTER RENOVATIONS & EQUIPMENTcpd11-20bk.pdf
68NY023-017Science Lab Renovations42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D3002500002500000025000000000000250000002500PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNSCIENCE LAB RENOVATIONScpd11-20bk.pdf
69NY024-018Exterior Space Improvements42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D30050000500000050000000000005000000500PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNUPGRADE EXTERIOR SPACES AT NEW YORK CITY TECHcpd11-20bk.pdf
70NY025-018Pearl Street Building Renovation42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D300 HN-D004 HN-0300 HN-K002 HN-K300250017619505550000326600000000176195055500003266PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNPEARL STREET BUILDING RENOVATIONcpd11-20bk.pdf
71NY028-020Pearl Building Renovations42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-D3002500002500000025000000000000250000002500PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNPEARL BUILDING RENOVATIONScpd11-20bk.pdf
72SAND-KG02HVAC Repair/Replacement - Sandy Related42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-0206285280048600051425600000025628400486000770PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNHVAC REPAIR/REPLACEMENT - SANDY RELATEDcpd11-20bk.pdf
73SAND-KG03Marina Reconstruction42CITY UNIVERSITYMISCELLANEOUS RECONSTRUCTION300BROOKLYNHN-K250 HN-0206259243025001270000381338304139000045224260663912700008335PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGNMARINA RECONSTRUCTIONcpd11-20bk.pdf
74NDF-PENNNDF - 127 Pennsylvania Ave Community Center56POLICE DEPARTMENTNEIGHBORHOOD REVITALIZATION300BROOKLYNED-0384490990191680000001069900000000901916800000010699NYPD - 127 PENNSYLVANIA AVENUE COMMUNICATIONS CENTERcpd11-20bk.pdf
75PO7911FR11 FRONT STR RENOVATION56POLICE DEPARTMENTPOLICE FACILITIES300BROOKLYNPO-00793747585719300000605000000000585719300000605011 FRONT STR RENOVATIONcpd11-20bk.pdf
76PO79BMAHSFIRING RANGE RECONSTRUCTION AT CONEY ISLAND56POLICE DEPARTMENTPOLICE FACILITIES300 313BROOKLYNPO-007925914432147000002590000000004432147000002590PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGN2556 MCDONALD AV, BRROKLYN NYRANGE RECONSTRUCTIONcpd11-20bk.pdf
77PO79BMAKGFBF AVIATION AND DRIVER TRAINING UNIT ROOF REHABILITATION56POLICE DEPARTMENTPOLICE FACILITIES300BROOKLYNPO-0079275603501500906000275600000000035015009060002756SCOPE DESCRIPTIONcpd11-20bk.pdf
78PO79BMAKJREHABILITATION OF 67TH PCT ELEVATOR56POLICE DEPARTMENTPOLICE FACILITIES300BROOKLYNPO-00791500001500000015000000000000150000001500ESTIMATEcpd11-20bk.pdf
79PO79BMAKQ66TH PCT RENOVATION56POLICE DEPARTMENTPOLICE FACILITIES300BROOKLYNPO-0079600010058100006810000000001005810000681ESTIMATEcpd11-20bk.pdf
80PO79BMAKR88TH PCT ROOF REPLACEMENT56POLICE DEPARTMENTPOLICE FACILITIES300BROOKLYNPO-007960006000000060000000000060000000600ESTIMATEcpd11-20bk.pdf
81PO79BMAKS81ST PCT ROOF REPLACEMENT56POLICE DEPARTMENTPOLICE FACILITIES300BROOKLYNPO-007960006000000060000000000060000000600ESTIMATEcpd11-20bk.pdf
82PO79BMAKT60TH PCT ROOF REPLACEMENT56POLICE DEPARTMENTPOLICE FACILITIES300BROOKLYNPO-0079600020004000006000000000002000400000600ESTIMATEcpd11-20bk.pdf
83PO79BMAKW245 GLENMORE ROOF REPLACEMENT56POLICE DEPARTMENTPOLICE FACILITIES300BROOKLYNPO-007930003000000030000000000030000000300ESTIMATEcpd11-20bk.pdf
84PO79TD32TRANSIT DISTRICT 32 ROOF RENOVATION56POLICE DEPARTMENTPOLICE FACILITIES300BROOKLYNPO-0079480539325000008640000000053932500000864PROJECT DELAYED DUE TO UNFORESEEN SITE/FIELD CONDITION960 CAROLL STREET, BROOKLYNROOF RENOVATIONcpd11-20bk.pdf
85PODMTRPEMounted Unit facility betterment56POLICE DEPARTMENTPOLICE FACILITIES300BROOKLYNPO-D079 PO-007910401230000012300000000012300000123ESTIMATEcpd11-20bk.pdf
86PO-KVESTPEOPLE'S PRECINCTS VESTIBULE REDESIGN56POLICE DEPARTMENTPOLICE FACILITIES300BROOKLYNPO-K079100022877200000100000000000228772000001000RENOVATIONcpd11-20bk.pdf
87SANDCD13PROPERTY CLERK ELECTRICAL CONDUIT56POLICE DEPARTMENTPOLICE FACILITIES300BROOKLYNPO-007997040971000009710873300000873309704000009704PROJECT DELAYED DUE TO UNFORESEEN SITE/FIELD CONDITIONERIE BASIN PROPERTY CLERKPROPERTY CLERKcpd11-20bk.pdf
88SANDCD3POLICE SERVICE AREA 1 (PSA1)56POLICE DEPARTMENTPOLICE FACILITIES300BROOKLYNPO-0079322627000003355234000002896126100000322PROJECT DELAYED DUE TO UNFORESEEN SITE/FIELD CONDITION2860 WEST 23RD STREET BROOKLYNELECTRICAL REHABILITATIONcpd11-20bk.pdf
89SANDCD4FLOYD BENNETT FIELD ELECTRICAL56POLICE DEPARTMENTPOLICE FACILITIES300BROOKLYNPO-00795750580000058051700000517057500000575PROJECT DELAYED DUE TO UNFORESEEN SITE/FIELD CONDITIONELECTRICAL REHABILITATIONcpd11-20bk.pdf
90SANDCD5TRANSIT DISTRICT 34 ELECTRICAL56POLICE DEPARTMENTPOLICE FACILITIES300BROOKLYNPO-0079105879900000106678850000095274984000001058PROJECT DELAYED DUE TO UNFORESEEN SITE/FIELD CONDITIONELECTRICAL REHABILITATIONcpd11-20bk.pdf
91SANDWARE23RD STR WAREHOUSE RECONSTRUCTION56POLICE DEPARTMENTPOLICE FACILITIES300BROOKLYNPO-007984340872000008720783500000783508707000008707RECONSTRUCTIONcpd11-20bk.pdf
92ACEFDN701FDNY - LED LIGHTING UPGRADE AT 14 FDNY FACILITIES57FIRE DEPARTMENTBUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT301BROOKLYNPU-0025108442765600000108300000000427656000001083FDNY - LED LIGHTING UPGRADE AT 14 FDNY FACILITIEScpd11-20bk.pdf
93ACEFDN703FDNY - DESIGN & INSTALLATION OF 37 KW SOLAR SYSTEM AT EC33257FIRE DEPARTMENTBUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT301BROOKLYNPU-00252354451800000562000000004451800000562FDNY - DESIGN & INSTALLATION OF 37 KW SOLAR PHOTOVOLTAIC SYSTEM AT EC3332cpd11-20bk.pdf
94ACEFDN801FDNY - Solar Photo-voltaic system at EMS 5857FIRE DEPARTMENTBUILDING CONSTRUCTION, RECONSTRUCTION OR RETROFIT301BROOKLYNPU-00252573702210000258000000003702210000258SOLAR PHOTO-VOLTAIC SYSTEM AT EMS 58cpd11-20bk.pdf
95F175MC218Multi-Component Renovations - EC21857FIRE DEPARTMENTNEW FACILITIES AND RENOVATIONS304BROOKLYNF-017555986760525000005926000000006760525000005926PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTSMULTI-COMPONENT RENOVATIONS - EC218cpd11-20bk.pdf
96F175MC224FLOOR, KITCHEN L-OHD - EC22457FIRE DEPARTMENTNEW FACILITIES AND RENOVATIONS302BROOKLYNF-0175228281232822000001094500000000812328220000010945PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTSFLOOR, KITCHEN L-OHD - EC224cpd11-20bk.pdf
97FD175E249ROOF REPLACEMENT - EC24957FIRE DEPARTMENTNEW FACILITIES AND RENOVATIONS309BROOKLYNF-D175500000005050000000000000005050PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTSROOF REPLACEMENTcpd11-20bk.pdf
98FD175W245WINDOW REPLACEMENT - EC24557FIRE DEPARTMENTNEW FACILITIES AND RENOVATIONS313BROOKLYNF-D175750261488000007490000000026148800000749PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTSWINDOW REPLACEMENT - EC245cpd11-20bk.pdf
99FD175W248WINDOW REPLACEMENT - EC24857FIRE DEPARTMENTNEW FACILITIES AND RENOVATIONS317BROOKLYNF-D175375161214000003750000000016121400000375PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTSWINDOW REPLACEMENT - EC248cpd11-20bk.pdf
100FD175W330Window Replacement - EC33057FIRE DEPARTMENTNEW FACILITIES AND RENOVATIONS311BROOKLYNF-D175 F-0175582249478000007270000000024947800000727WINDOW REPLACEMENT - EC330cpd11-20bk.pdf
Previewing 100 of 5,200 rows